Knowledge Centre · Guide · Bored piles, earthquake and liquefaction
Are Bored Piles Earthquake-Resistant? Liquefaction and TBDY
Bored piles carry earthquake loads down to firmer layers, but they are not a guarantee on their own. Ground, design and workmanship decide safety together. This guide explains how an earthquake loads a pile, what changes in liquefiable ground and what the Turkish seismic code (TBDY 2018) asks for.

Topic
Piled foundations and earthquakes
Reading time
About 7 minutes
Author
Abdullah Çetintaş, Geological Engineer
Updated
November 2026
Code
TBDY 2018, Chapter 16
Design by
The design engineer
Are bored piles safe in an earthquake?
The short answer is yes, if they are designed and built correctly. However, “we installed bored piles, so the building is ready for an earthquake” is wrong. That is because a pile is only one part of a system.
A piled foundation takes the building load through weak layers and down to firmer ground. As a result, it reduces the risk of settlement and overturning in an earthquake. Even so, three conditions must come together:
- Ground data: Boreholes and laboratory tests show the soil class and the liquefaction risk.
- Design: The design engineer sizes the pile for horizontal load and moment as well as vertical load.
- Workmanship: We place the concrete continuously by tremie and connect the pile head properly to the foundation.
Note: The design engineer carries out the earthquake calculation. We carry out the construction, and our design partner prepares the design when needed.
What does an earthquake do to bored piles?
An earthquake loads a pile in two ways. The first comes from the building, and the second comes from the movement of the ground itself.
| Effect | Where it comes from | Where it strains the pile |
|---|---|---|
| Inertial effect | Horizontal force and moment from the swaying building | Mainly at the pile head and upper section |
| Kinematic effect | The ground bending the pile as it moves | At the depth where soft and stiff layers meet |
For this reason, vertical capacity alone is not enough. For example, where soft clay sits on a stiff layer, the pile also bends at the boundary. In addition, the connection between pile head and raft is where the horizontal load passes.
TBDY 2018 covers these two effects under structure-pile-soil interaction. Its Annex 16C sets out three methods for this. This interaction matters especially for piled buildings on ZD, ZE and ZF soil classes.
Why are bored piles not enough alone in earthquake liquefaction?
Liquefaction is when saturated loose sand and silt lose their strength during an earthquake. For a short time, the ground behaves like a liquid. A pile passes through this layer, but it does not change it.
- Shaft friction drops: The liquefied layer does not carry load to the pile, so we leave it out of the calculation.
- Lateral support drops: That part of the pile works like an unsupported column.
- Lateral spreading starts: On slopes and near the shore, the ground flows sideways and pushes the pile.
- Settlement follows: After the earthquake the layer densifies and adds a downward load on the pile.
Therefore the solution usually takes one of two routes. First, we can take the pile below the liquefiable layer and check horizontal loads for the liquefied state. Alternatively, we can improve the ground with jet grouting, deep soil mixing or dynamic compaction. On many projects the design engineer asks for both.
In Istanbul this risk comes up especially in coastal and alluvial areas. We describe the areas in our Istanbul ground conditions guide.
What does TBDY 2018 ask for?
Chapter 16 of the Turkish Building Earthquake Code sets the rules for foundation soils and foundations under earthquake. The summary below does not replace the code, but it shows what to look for in a design.
- Soil class: The code defines soil parameters for the top 30 m below the foundation or pile cap (Article 16.4.2, Table 16.1).
- Liquefaction: The assessment rules are in Section 16.6 and Annex 16B.
- Piled foundations: Chapter 16 has separate rules for piled foundations, and Annex 16C covers the interaction analysis.
That is why a sound site investigation comes first. After all, the soil class and the liquefaction decision rest on borehole data.
What do we check on site?
However good the design is, poor workmanship shows itself in an earthquake. For that reason, we follow these points on site:
- We compare pile length and the toe layer with the design during drilling.
- We lower the reinforcement cage with the length and link spacing in the design.
- We place the concrete continuously by tremie to prevent segregation.
- We trim the pile head down to sound concrete and connect the starter bars to the foundation.
- When required, we arrange a pile integrity test with our testing partner.
You can also find more detail on these steps in our guide to common site mistakes.
Frequently asked questions about bored piles and earthquake
We have collected the questions we hear most often about bored piles and earthquakes. However, the decision for your building rests on the site investigation and the design.
Earthquake, liquefaction and piles
Will a building on bored piles survive any earthquake?
Piles alone do not decide that. The design and construction of the structure above matter at least as much as the foundation. A pile is only one part of the foundation system.
Can you install piles where there is a liquefaction risk?
Yes. However, the pile must go below the liquefiable layer, and the design must take that layer into account. If needed, we also add ground improvement.
Piles or ground improvement?
That depends on the building load, the thickness of the liquefiable layer and the site. So the design engineer decides based on the site investigation. Some projects need both.
Who determines the soil class?
The engineer who prepares the site investigation determines it from boreholes and field tests. We carry out site investigations with our drilling partner.
Does adding piles to an existing building help in an earthquake?
It helps if the foundation is inadequate, but it does not fix weaknesses in the structure above. So have an engineer review the whole building first. Our underpinning page explains the options.
Sources
Let us review your site investigation together
Send us the site investigation report and the drawings. Then we can agree the piling and ground improvement options together with our design partner.