Services · Engineering · Geotechnical design

Geotechnical Design and Shoring Design: Buildable, Economical Solutions

Geotechnical design for a deep excavation means designing the system that will hold the ground and neighbouring buildings safely. Our geotechnical design partner prepares the designs; we add our site experience on system choice, buildability and cost.

Geotechnical design options for shoring: cantilever wall, anchored wall, propped wall and soil nail wall
Shoring system options, schematic drawing

Prepared by

Our geotechnical design partner

Scope

Shoring, piled foundations, ground improvement

Our input

Buildability and cost

Inputs

Site investigation, architectural and structural design

Outputs

Calculation report and construction drawings

Region

Türkiye and Central Asia

What is geotechnical design for shoring?

Shoring design is the design of the temporary or permanent system that holds the ground, groundwater and neighbouring buildings during a basement excavation. The design also covers the system type, element sizes, excavation stages and the monitoring plan.

Our geotechnical design partner prepares the design. Meanwhile we think from the start about how it will work on site: where the rig will go in, in what order the dig will advance, and whether an anchor will pass under the neighbouring plot. This way the system on paper also works on site.

Choosing a system in geotechnical design

Excavation depth, ground, groundwater and neighbouring buildings together decide the system. On most projects we also combine more than one system.

SystemWhen we choose itWhat to watch
Cantilever pile wallShallow cut, firm groundMovement at the top of the wall
Anchored wallDeep cut, neighbours close byAnchors passing under the neighbouring plot
Propped wallNarrow cut, or anchors not possibleStruts getting in the way of the dig
Soil nail wallSuitable ground, no waterDistance to neighbouring buildings
Secant piles or jet groutingHigh groundwaterCut-off and base sealing

How do we prepare a shoring design?

We prepare a shoring design in five steps. At every step we also bring in the views of the construction team.

  1. Data collection: We gather the site investigation, the architectural and structural designs, and details of neighbouring buildings.
  2. System choice: We compare several options for cost, time and risk.
  3. Calculations: Our design partner runs the stability, force and displacement calculations.
  4. Construction drawings: The drawings show the piles, anchors, waler beams and excavation stages.
  5. Monitoring plan: The plan sets measuring points and limit values for the wall and neighbouring buildings.

The most common problem we see: a design that cannot be built on site. For example, a bench too narrow for the rig, or an anchor angle that runs into a neighbour’s foundation. That is why we also check the design through a contractor’s eyes.

Ways to reduce cost through geotechnical design

The design stage often sets the cost of shoring. However, there are fair ways to cut cost without compromising safety.

  • Using correct soil parameters so that piles and anchors are not longer than needed
  • Optimising the number of anchor rows and the pile spacing
  • Mixed solutions, such as soil nails above and an anchored wall below
  • Setting the excavation and construction sequence to suit the programme

We review these proposals with our design partner. The designer, however, always makes the final decision.

What do you need for a geotechnical design quote?

The size, depth and complexity of the excavation set the design fee. Even so, the documents below are enough for a quote.

  • Site investigation report
  • Architectural design: site plan, number of basement levels and sections
  • Structural design and foundation plan
  • Details of neighbouring buildings and services

Also, if you have no site investigation yet, we can plan one with our drilling partner.

Frequently asked questions about geotechnical design

We have grouped the questions we receive by who asks them. If yours is not here, call us or write through the quote form.

Owners and architects

When do you need a shoring design?

You need one when the excavation gets deep and could affect a neighbouring building, a road or services. So the design should be ready before excavation, during the permit process.

Who prepares the shoring design?

Our geotechnical design partner prepares the design. We contribute on buildability, cost and the construction sequence.

How much basement space does shoring take?

The wall takes up its own thickness plus a construction tolerance. That is why the wall thickness should be settled at the concept design stage.

Are shoring and foundations in the same design?

They are usually separate designs, but they must work together. For example, a pile wall can also serve as the outer formwork for the basement wall.

Contractors and project managers

How long does the design take?

In general, the size of the excavation and how ready the data are set the time. For example, the process moves faster when the site investigation and architectural design are complete.

Can the design change on site?

If we meet unexpected ground while drilling, we tell the designer, and the design is revised if needed. That is why we record site observations every day.

Why should monitoring be part of the design?

Measurements show whether the wall and neighbouring buildings behave as calculated. Also, if movement goes past the limit values, monitoring buys time to take action.

Designers and supervising engineers

Which codes and standards apply?

For design, the designer follows TBDY 2018 and Eurocode 7. On site, we work to standards such as EN 1536, EN 1537 and EN 14490, which Türkiye adopts as TS EN standards.

What sets the displacement limit?

The sensitivity of neighbouring buildings and services sets the limit. For example, next to a sensitive building you need a stiffer system and tighter limits.

Academics and students

What are active and passive earth pressure?

Active pressure develops as the wall moves towards the excavation. Passive pressure, on the other hand, is the resistance that develops as the embedded part of the wall pushes into the ground.

What is base heave in an excavation?

In soft clay, for example, the base of the excavation can heave as soil moves in from under the wall. So deep excavations need a separate check of base stability.

Abdullah Çetintaş, Geological Engineer, founder of Fen Zemin & İnşaat

Abdullah Çetintaş

Geological Engineer · Founder, Fen Zemin & İnşaat

In ground engineering and foundations since 2006. This page draws on the site experience of Abdullah and our team.

LinkedIn profile · Last updated: November 2026

Sources

Contact us about geotechnical design

Send us your site investigation and architectural design. We will plan the right system and the design process with our partner.