{"id":2499,"date":"2025-07-04T14:32:58","date_gmt":"2025-07-04T14:32:58","guid":{"rendered":"https:\/\/fenzemin.com\/services\/ground-nail\/"},"modified":"2026-10-24T13:39:59","modified_gmt":"2026-10-24T13:39:59","slug":"ground-nail","status":"publish","type":"page","link":"https:\/\/fenzemin.com\/en\/services\/ground-nail\/","title":{"rendered":"Ground Nail"},"content":{"rendered":"\n<div class=\"wp-block-uagb-container uagb-block-cef93154 alignfull uagb-is-root-container\"><div class=\"uagb-container-inner-blocks-wrap\">\n<div class=\"wp-block-uagb-advanced-heading uagb-block-ee43a231\"><h1 class=\"uagb-heading-text\"><code>Soil Nailing &amp; Soil Nail Walls | Fen Zemin &amp; \u0130n\u015faat<\/code><\/h1><\/div>\n<\/div><\/div>\n\n\n\n<figure class=\"wp-block-image aligncenter size-full is-resized wp-duotone-unset-1\" style=\"margin-top:30px;margin-bottom:30px\"><img decoding=\"async\" width=\"887\" height=\"763\" src=\"https:\/\/fenzemin.com\/wp-content\/uploads\/2025\/07\/zemin-civisi.webp\" alt=\"\" class=\"wp-image-2193\" style=\"width:564px;height:auto\" srcset=\"https:\/\/fenzemin.com\/wp-content\/uploads\/2025\/07\/zemin-civisi.webp 887w, https:\/\/fenzemin.com\/wp-content\/uploads\/2025\/07\/zemin-civisi-300x258.webp 300w, https:\/\/fenzemin.com\/wp-content\/uploads\/2025\/07\/zemin-civisi-768x661.webp 768w\" sizes=\"(max-width: 887px) 100vw, 887px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Soil Nailing &amp; Soil Nail Walls | Fen Zemin &amp; \u0130n\u015faat<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Fen Zemin &amp; \u0130n\u015faat carries out <strong>soil nailing<\/strong> for excavation support and slope stabilisation projects, with nail geometry, drilling method, facing system and construction sequence determined according to ground conditions and geotechnical design.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Soil nailing is a passive reinforcement method in which steel bars are installed into the ground at defined angles and spacing to create a reinforced soil mass.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The nails generally work together with the surrounding ground, shotcrete facing, reinforcement and drainage system.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">At Fen Zemin &amp; \u0130n\u015faat, soil nailing is evaluated as a complete retaining system rather than simply as a drilling operation.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What Is Soil Nailing?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Soil nailing is a ground reinforcement technique used to improve the stability of excavations and slopes.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Steel reinforcement bars are installed in drilled holes and typically bonded to the surrounding ground with cement grout.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">As excavation progresses and the retained ground undergoes small movements, tensile forces develop in the soil nails.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For this reason, soil nails are generally considered passive reinforcement elements.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">They are not normally prestressed in the same way as ground anchors.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Where Is Soil Nailing Used?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Soil nailing may be used in:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>deep excavations,<\/li>\n\n\n\n<li>basement excavations,<\/li>\n\n\n\n<li>road cuttings,<\/li>\n\n\n\n<li>slope stabilisation,<\/li>\n\n\n\n<li>urban redevelopment projects,<\/li>\n\n\n\n<li>retaining structures,<\/li>\n\n\n\n<li>infrastructure works.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The method is particularly suitable where staged top-down excavation is possible and the ground can remain sufficiently stable during each construction stage.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Not every excavation is suitable for soil nailing.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Ground conditions, groundwater, neighbouring structures, excavation geometry and deformation limits must be considered before the method is selected.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How Does a Soil Nail Wall Work?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A soil nail wall does not rely on a single structural element.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The system works through the interaction between:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>the reinforced soil mass,<\/li>\n\n\n\n<li>steel soil nails,<\/li>\n\n\n\n<li>grout surrounding the nails,<\/li>\n\n\n\n<li>shotcrete or other facing,<\/li>\n\n\n\n<li>reinforcement mesh,<\/li>\n\n\n\n<li>drainage.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">As excavation progresses, the ground tends to deform.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This deformation mobilises tensile forces in the nails.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The nails then help restrain the soil mass and improve overall stability.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The facing distributes local loads and helps maintain the stability of the excavation surface.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How Is Soil Nailing Installed?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Soil nail construction usually progresses from the top downward in controlled excavation stages.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">1. Project and Site Review<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Before construction begins, the geotechnical design and available ground information are reviewed.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Important design parameters may include:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>nail length,<\/li>\n\n\n\n<li>inclination,<\/li>\n\n\n\n<li>horizontal spacing,<\/li>\n\n\n\n<li>vertical spacing,<\/li>\n\n\n\n<li>bar diameter,<\/li>\n\n\n\n<li>grout requirements,<\/li>\n\n\n\n<li>facing thickness,<\/li>\n\n\n\n<li>excavation stages.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Site conditions are also assessed.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Neighbouring buildings, utilities, access restrictions and groundwater may affect the construction method.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">2. Staged Excavation<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Soil nail walls are generally constructed in stages.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A limited excavation depth is completed first.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The exposed face is then stabilised before the next excavation stage begins.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This sequence is fundamental to the performance of the system.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Excavating too deeply before installing the required reinforcement can increase instability and deformation risk.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">3. Surface Preparation<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The excavation face is trimmed and prepared.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Depending on the ground conditions and design, an initial layer of shotcrete may be applied before drilling.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In more stable ground, drilling may be carried out directly before the main facing is installed.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The exact sequence should follow the approved geotechnical design.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">4. Soil Nail Drilling<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Holes are drilled at the specified locations and inclinations.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The drilling method depends on:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>soil conditions,<\/li>\n\n\n\n<li>groundwater,<\/li>\n\n\n\n<li>nail length,<\/li>\n\n\n\n<li>borehole stability,<\/li>\n\n\n\n<li>access conditions.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The drilling angle and position should follow the project requirements.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Changing the geometry simply to make drilling easier can affect the behaviour of the system.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">5. Reinforcement Bar Installation<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The specified steel bar is installed into the drilled hole.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Centralisers or other detailing may be used where required to position the reinforcement correctly within the hole.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For permanent systems, corrosion protection requirements may also affect the type of reinforcement and protective measures.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">6. Grouting<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The annular space around the steel bar is filled with cementitious grout.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The grout provides bond between the steel reinforcement and the surrounding ground.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This bond is essential because soil nail forces are transferred into the ground through the grouted length.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Grouting quality therefore directly affects the performance of the nail.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Soil Nailing and Shotcrete<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Shotcrete is commonly used as the facing element of a soil nail wall.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">After the nails are installed, reinforcement mesh and nail-head details may be completed before the shotcrete layer is applied.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The facing system may include:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>welded wire mesh,<\/li>\n\n\n\n<li>reinforcing bars,<\/li>\n\n\n\n<li>nail-head plates,<\/li>\n\n\n\n<li>shotcrete,<\/li>\n\n\n\n<li>drainage elements.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Shotcrete should not be considered only as surface protection.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In a soil nail wall, it forms part of the retaining system and helps distribute loads between adjacent nails.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What Is the Difference Between a Soil Nail and a Ground Anchor?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Soil nails and ground anchors may appear similar during drilling, but their structural behaviour is different.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A <strong>soil nail<\/strong> is generally a passive reinforcement element.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">It develops tensile load as the reinforced ground mass deforms.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A <strong>prestressed ground anchor<\/strong> is actively tensioned and transfers a defined force into the ground or rock before significant retaining-wall movement occurs.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The two systems should therefore not be treated as interchangeable.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The appropriate system depends on:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>ground conditions,<\/li>\n\n\n\n<li>excavation depth,<\/li>\n\n\n\n<li>allowable deformation,<\/li>\n\n\n\n<li>surrounding structures,<\/li>\n\n\n\n<li>available working area,<\/li>\n\n\n\n<li>construction sequence.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Which Soils Are Suitable for Soil Nailing?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Soil nailing is generally most suitable where the ground can remain stable for a short period during staged excavation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Suitable conditions may include:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>stiff cohesive soils,<\/li>\n\n\n\n<li>dense granular soils with sufficient apparent stability,<\/li>\n\n\n\n<li>weathered formations,<\/li>\n\n\n\n<li>certain residual soils.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The method may be less suitable in very loose, running or highly unstable soils unless additional measures are used.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Suitability should be confirmed from geotechnical information rather than assumed from surface appearance.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How Does Groundwater Affect Soil Nailing?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Groundwater can significantly affect soil nail wall performance.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Water may reduce face stability, increase pore pressures and create local erosion or washout.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Drainage is therefore an important part of many soil nail systems.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Depending on the design, drainage measures may include:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>weep holes,<\/li>\n\n\n\n<li>drainage strips,<\/li>\n\n\n\n<li>surface drainage,<\/li>\n\n\n\n<li>local collection systems,<\/li>\n\n\n\n<li>other groundwater-control measures.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">A shotcrete facing should not trap uncontrolled water pressure behind the wall.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How Are Nail Length, Angle and Spacing Determined?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">There is no single standard soil nail geometry suitable for every project.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Nail length, inclination and spacing depend on:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>excavation height,<\/li>\n\n\n\n<li>soil strength,<\/li>\n\n\n\n<li>groundwater,<\/li>\n\n\n\n<li>potential failure surfaces,<\/li>\n\n\n\n<li>external loads,<\/li>\n\n\n\n<li>neighbouring structures,<\/li>\n\n\n\n<li>required factor of safety,<\/li>\n\n\n\n<li>deformation criteria.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The design should evaluate both internal and external stability.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The construction layout should therefore follow the approved geotechnical design rather than standard field dimensions.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Temporary and Permanent Soil Nail Walls<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Soil nail systems may be temporary or permanent depending on the project requirements.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Temporary Soil Nail Walls<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Temporary systems are generally used during construction and may later be incorporated behind or replaced by permanent structural elements.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Permanent Soil Nail Walls<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Permanent systems remain part of the long-term retaining structure.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Durability, corrosion protection, facing details and drainage therefore require greater long-term consideration.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The intended service life should be defined during design.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Corrosion Protection for Soil Nails<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Permanent soil nail systems require appropriate durability measures.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Depending on the design and exposure conditions, corrosion protection may involve:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>grout cover,<\/li>\n\n\n\n<li>coated reinforcement,<\/li>\n\n\n\n<li>protective sheaths,<\/li>\n\n\n\n<li>project-specific corrosion protection systems.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The required level of protection depends on the service life, ground conditions and applicable design requirements.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Corrosion protection should not be selected informally during construction.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Soil Nail Pullout Testing<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Pullout testing may be used to evaluate the bond resistance between the grouted soil nail and the surrounding ground.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">During the test, load is applied to the nail and the corresponding movement is monitored.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The test can help verify whether the ground-grout interface develops the required resistance.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Test procedures, test loads and acceptance criteria should be defined by the geotechnical design or technical specification.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Soil Nailing Quality Control<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Because soil nails remain largely below ground, quality control is important.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Depending on the project, field records may include:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>drilling location,<\/li>\n\n\n\n<li>nail inclination,<\/li>\n\n\n\n<li>nail length,<\/li>\n\n\n\n<li>reinforcement details,<\/li>\n\n\n\n<li>grout records,<\/li>\n\n\n\n<li>pullout test results,<\/li>\n\n\n\n<li>shotcrete thickness,<\/li>\n\n\n\n<li>reinforcement mesh details.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Construction records help confirm that the installed system is consistent with the approved design.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Why Is Staged Excavation Important?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The construction sequence is one of the most important aspects of soil nail wall performance.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Soil nailing is generally installed from the top downward.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Each excavation stage exposes a limited height of soil.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The nails, drainage and facing for that stage are then completed before excavation continues.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This sequence helps control deformation and maintain face stability.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The excavation depth per stage should therefore follow the design and observed ground conditions.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Soil Nailing vs Ground Anchors<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Soil nailing and ground anchors are both used in excavation support, but they work differently.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Soil nails reinforce the ground mass itself and are generally passive.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Ground anchors actively support a retaining structure through prestressing.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Soil nail walls can be effective where staged excavation and moderate ground deformation are acceptable.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Anchored retaining systems may be more appropriate where stricter deformation control or different structural behaviour is required.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The final choice should be based on project-specific geotechnical analysis.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Soil Nailing vs Bored Pile Retaining Walls<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A soil nail wall reinforces the existing ground mass and generally uses shotcrete as the facing.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A bored pile retaining wall creates a line of structural pile elements before or during excavation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Bored pile systems may be more appropriate where:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>the ground cannot remain stable during unsupported excavation,<\/li>\n\n\n\n<li>deformation limits are strict,<\/li>\n\n\n\n<li>neighbouring structures are sensitive,<\/li>\n\n\n\n<li>excavation conditions require a more rigid retaining system.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Soil nailing can be more efficient where the ground is suitable and staged excavation is feasible.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">These systems should therefore not be selected solely by comparing unit prices.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Advantages of Soil Nailing<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Where ground and site conditions are suitable, soil nailing can provide several practical advantages.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">These may include:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>top-down construction,<\/li>\n\n\n\n<li>relatively compact drilling equipment,<\/li>\n\n\n\n<li>adaptability to irregular excavation geometry,<\/li>\n\n\n\n<li>limited working space requirements,<\/li>\n\n\n\n<li>integration with shotcrete facing,<\/li>\n\n\n\n<li>flexibility during staged excavation.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The method can be particularly useful on urban sites where large retaining equipment would be difficult to mobilise.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Limitations of Soil Nailing<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Soil nailing also has limitations.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The method may be less suitable where:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>the ground cannot remain stable during staged excavation,<\/li>\n\n\n\n<li>groundwater is uncontrolled,<\/li>\n\n\n\n<li>large deformations cannot be tolerated,<\/li>\n\n\n\n<li>underground obstructions interfere with nail installation,<\/li>\n\n\n\n<li>neighbouring foundations conflict with nail geometry,<\/li>\n\n\n\n<li>property boundaries restrict nail length.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">These conditions should be reviewed before the method is selected.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Soil Nailing Cost<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Soil nailing cost should not be evaluated only from the total drilling length.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The total cost may be affected by:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>number of nails,<\/li>\n\n\n\n<li>nail length,<\/li>\n\n\n\n<li>borehole diameter,<\/li>\n\n\n\n<li>ground conditions,<\/li>\n\n\n\n<li>reinforcement,<\/li>\n\n\n\n<li>grout quantity,<\/li>\n\n\n\n<li>shotcrete thickness,<\/li>\n\n\n\n<li>mesh reinforcement,<\/li>\n\n\n\n<li>pullout testing,<\/li>\n\n\n\n<li>drainage,<\/li>\n\n\n\n<li>excavation stages,<\/li>\n\n\n\n<li>project location,<\/li>\n\n\n\n<li>mobilisation.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Two projects with similar excavation heights can therefore have significantly different costs.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A reliable quotation requires review of both the geotechnical design and actual site conditions.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How Does Fen Zemin &amp; \u0130n\u015faat Evaluate a Soil Nailing Project?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The initial review begins with the available technical documents.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Where available, we review:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>ground investigation report,<\/li>\n\n\n\n<li>excavation support design,<\/li>\n\n\n\n<li>excavation sections,<\/li>\n\n\n\n<li>nail lengths,<\/li>\n\n\n\n<li>nail spacing,<\/li>\n\n\n\n<li>nail inclination,<\/li>\n\n\n\n<li>shotcrete details,<\/li>\n\n\n\n<li>drainage requirements.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Site conditions are then evaluated.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Neighbouring buildings, working space, equipment access, property boundaries, groundwater and excavation sequence may all affect construction.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The objective is to ensure that the approved soil nail system can realistically be executed under the actual site conditions.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Soil Nailing in Istanbul and Across T\u00fcrkiye<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Fen Zemin &amp; \u0130n\u015faat is based in \u00dcmraniye, Istanbul.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Soil nailing projects in Istanbul and other regions of T\u00fcrkiye may be evaluated depending on excavation geometry, project size, ground conditions, mobilisation requirements and site access.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Projects may include:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>deep excavations,<\/li>\n\n\n\n<li>basement works,<\/li>\n\n\n\n<li>slope stabilisation,<\/li>\n\n\n\n<li>urban redevelopment,<\/li>\n\n\n\n<li>infrastructure projects,<\/li>\n\n\n\n<li>retaining systems.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Each project is assessed individually before the construction method and equipment requirements are defined.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Soil Nailing Frequently Asked Questions<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">What is soil nailing?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Soil nailing is a passive ground reinforcement method in which steel bars are installed into drilled and grouted holes to improve the stability of excavations or slopes.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Is a soil nail the same as a ground anchor?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">No. Soil nails are generally passive reinforcement elements, while prestressed ground anchors are actively tensioned.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Is shotcrete always used with soil nails?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Shotcrete is commonly used as the facing system in soil nail walls, but the exact facing arrangement depends on the project design.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">How are soil nails installed?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Soil nails are generally installed in stages as excavation progresses. Holes are drilled, steel bars are placed, grout is injected and the facing system is completed before excavation continues.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">How long are soil nails?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">There is no single standard length. Nail length depends on excavation height, ground conditions, stability requirements and the geotechnical design.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Can soil nailing be used permanently?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Yes. Soil nail walls may be designed as temporary or permanent systems. Permanent applications require appropriate durability and corrosion protection.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">What is a soil nail pullout test?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">A pullout test applies controlled tensile load to a soil nail to evaluate the bond resistance between the grouted nail and the surrounding ground.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Can soil nailing be used in groundwater?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Groundwater does not automatically prevent soil nailing, but drainage and groundwater conditions must be carefully considered. Uncontrolled water can significantly affect face stability and system performance.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">What determines soil nailing cost?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Nail quantity, length, ground conditions, grout, reinforcement, shotcrete, drainage, testing, excavation sequence and mobilisation all affect total cost.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">What information is required for a soil nailing quotation?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Where available, the ground investigation report, excavation support design, nail layout, lengths, quantities, shotcrete details, project location and site information should be provided.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Discuss Your Soil Nailing Project with Fen Zemin &amp; \u0130n\u015faat<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">For deep excavations, slope stabilisation and soil nail wall applications, you can share your available project information with Fen Zemin &amp; \u0130n\u015faat.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Where available, provide the ground investigation report, excavation support design, soil nail layout, shotcrete details and site information so that the technical scope and construction requirements can be reviewed accurately.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Contact the Fen Zemin &amp; \u0130n\u015faat technical team to discuss your soil nailing project.<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Soil Nailing &amp; Soil Nail Walls | Fen Zemin &amp; \u0130n\u015faat Soil Nailing &amp; Soil Nail Walls | Fen Zemin &amp; \u0130n\u015faat Fen Zemin &amp; \u0130n\u015faat carries out soil nailing for excavation support and slope stabilisation projects, with nail geometry, drilling method, facing system and construction sequence determined according to ground conditions and geotechnical design. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":2479,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_uag_custom_page_level_css":"","site-sidebar-layout":"no-sidebar","site-content-layout":"plain-container","ast-site-content-layout":"normal-width-container","site-content-style":"unboxed","site-sidebar-style":"unboxed","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"disabled","ast-breadcrumbs-content":"","ast-featured-img":"disabled","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"enabled","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"set","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"_joinchat":[],"footnotes":""},"class_list":["post-2499","page","type-page","status-publish","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Soil Nailing &amp; Soil Nail Walls | Fen Zemin &amp; \u0130n\u015faat<\/title>\n<meta name=\"description\" content=\"Fen Zemin \u0130n\u015faat provides soil nailing for excavation support and slope stabilisation, including drilling, grouting, shotcrete facing and pullout testing.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/fenzemin.com\/en\/services\/ground-nail\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Soil Nailing &amp; Soil Nail Walls | Fen Zemin &amp; \u0130n\u015faat\" \/>\n<meta property=\"og:description\" content=\"Fen Zemin \u0130n\u015faat provides soil nailing for excavation support and slope stabilisation, including drilling, grouting, shotcrete facing and pullout testing.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/fenzemin.com\/en\/services\/ground-nail\/\" \/>\n<meta property=\"og:site_name\" content=\"Fen Zemin &amp; \u0130n\u015faat\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/people\/FEN-zemin-inaat\/100069393232695\/\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-24T13:39:59+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/fenzemin.com\/wp-content\/uploads\/2025\/07\/zemin-civisi.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"887\" \/>\n\t<meta property=\"og:image:height\" content=\"763\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"15 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/fenzemin.com\\\/en\\\/services\\\/ground-nail\\\/\",\"url\":\"https:\\\/\\\/fenzemin.com\\\/en\\\/services\\\/ground-nail\\\/\",\"name\":\"Soil Nailing & Soil Nail Walls | Fen Zemin & \u0130n\u015faat\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/fenzemin.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/fenzemin.com\\\/en\\\/services\\\/ground-nail\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/fenzemin.com\\\/en\\\/services\\\/ground-nail\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/fenzemin.com\\\/wp-content\\\/uploads\\\/2025\\\/07\\\/zemin-civisi.webp\",\"datePublished\":\"2025-07-04T14:32:58+00:00\",\"dateModified\":\"2026-10-24T13:39:59+00:00\",\"description\":\"Fen Zemin \u0130n\u015faat provides soil nailing for excavation support and slope stabilisation, including drilling, grouting, shotcrete facing and pullout testing.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/fenzemin.com\\\/en\\\/services\\\/ground-nail\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/fenzemin.com\\\/en\\\/services\\\/ground-nail\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/fenzemin.com\\\/en\\\/services\\\/ground-nail\\\/#primaryimage\",\"url\":\"https:\\\/\\\/fenzemin.com\\\/wp-content\\\/uploads\\\/2025\\\/07\\\/zemin-civisi.webp\",\"contentUrl\":\"https:\\\/\\\/fenzemin.com\\\/wp-content\\\/uploads\\\/2025\\\/07\\\/zemin-civisi.webp\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/fenzemin.com\\\/en\\\/services\\\/ground-nail\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Anasayfa\",\"item\":\"https:\\\/\\\/fenzemin.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Services\",\"item\":\"https:\\\/\\\/fenzemin.com\\\/en\\\/services\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Ground Nail\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/fenzemin.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/fenzemin.com\\\/en\\\/\",\"name\":\"Fen Zemin & \u0130n\u015faat\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/fenzemin.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/fenzemin.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/fenzemin.com\\\/en\\\/#organization\",\"name\":\"Fen Zemin & \u0130n\u015faat\",\"url\":\"https:\\\/\\\/fenzemin.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/fenzemin.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/fenzemin.com\\\/wp-content\\\/uploads\\\/2025\\\/07\\\/fenzemin-logo.webp\",\"contentUrl\":\"https:\\\/\\\/fenzemin.com\\\/wp-content\\\/uploads\\\/2025\\\/07\\\/fenzemin-logo.webp\",\"width\":500,\"height\":250,\"caption\":\"Fen Zemin & \u0130n\u015faat\"},\"image\":{\"@id\":\"https:\\\/\\\/fenzemin.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/people\\\/FEN-zemin-inaat\\\/100069393232695\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/fen-zemin-inaat\\\/?viewAsMember=true\",\"https:\\\/\\\/www.instagram.com\\\/fenzemin\\\/\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Soil Nailing & Soil Nail Walls | Fen Zemin & \u0130n\u015faat","description":"Fen Zemin \u0130n\u015faat provides soil nailing for excavation support and slope stabilisation, including drilling, grouting, shotcrete facing and pullout testing.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/fenzemin.com\/en\/services\/ground-nail\/","og_locale":"en_US","og_type":"article","og_title":"Soil Nailing & Soil Nail Walls | Fen Zemin & \u0130n\u015faat","og_description":"Fen Zemin \u0130n\u015faat provides soil nailing for excavation support and slope stabilisation, including drilling, grouting, shotcrete facing and pullout testing.","og_url":"https:\/\/fenzemin.com\/en\/services\/ground-nail\/","og_site_name":"Fen Zemin &amp; \u0130n\u015faat","article_publisher":"https:\/\/www.facebook.com\/people\/FEN-zemin-inaat\/100069393232695\/","article_modified_time":"2026-10-24T13:39:59+00:00","og_image":[{"width":887,"height":763,"url":"https:\/\/fenzemin.com\/wp-content\/uploads\/2025\/07\/zemin-civisi.webp","type":"image\/webp"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"15 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/fenzemin.com\/en\/services\/ground-nail\/","url":"https:\/\/fenzemin.com\/en\/services\/ground-nail\/","name":"Soil Nailing & Soil Nail Walls | Fen Zemin & \u0130n\u015faat","isPartOf":{"@id":"https:\/\/fenzemin.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/fenzemin.com\/en\/services\/ground-nail\/#primaryimage"},"image":{"@id":"https:\/\/fenzemin.com\/en\/services\/ground-nail\/#primaryimage"},"thumbnailUrl":"https:\/\/fenzemin.com\/wp-content\/uploads\/2025\/07\/zemin-civisi.webp","datePublished":"2025-07-04T14:32:58+00:00","dateModified":"2026-10-24T13:39:59+00:00","description":"Fen Zemin \u0130n\u015faat provides soil nailing for excavation support and slope stabilisation, including drilling, grouting, shotcrete facing and pullout testing.","breadcrumb":{"@id":"https:\/\/fenzemin.com\/en\/services\/ground-nail\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/fenzemin.com\/en\/services\/ground-nail\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/fenzemin.com\/en\/services\/ground-nail\/#primaryimage","url":"https:\/\/fenzemin.com\/wp-content\/uploads\/2025\/07\/zemin-civisi.webp","contentUrl":"https:\/\/fenzemin.com\/wp-content\/uploads\/2025\/07\/zemin-civisi.webp"},{"@type":"BreadcrumbList","@id":"https:\/\/fenzemin.com\/en\/services\/ground-nail\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Anasayfa","item":"https:\/\/fenzemin.com\/en\/"},{"@type":"ListItem","position":2,"name":"Services","item":"https:\/\/fenzemin.com\/en\/services\/"},{"@type":"ListItem","position":3,"name":"Ground Nail"}]},{"@type":"WebSite","@id":"https:\/\/fenzemin.com\/en\/#website","url":"https:\/\/fenzemin.com\/en\/","name":"Fen Zemin & \u0130n\u015faat","description":"","publisher":{"@id":"https:\/\/fenzemin.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/fenzemin.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/fenzemin.com\/en\/#organization","name":"Fen Zemin & \u0130n\u015faat","url":"https:\/\/fenzemin.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/fenzemin.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/fenzemin.com\/wp-content\/uploads\/2025\/07\/fenzemin-logo.webp","contentUrl":"https:\/\/fenzemin.com\/wp-content\/uploads\/2025\/07\/fenzemin-logo.webp","width":500,"height":250,"caption":"Fen Zemin & \u0130n\u015faat"},"image":{"@id":"https:\/\/fenzemin.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/people\/FEN-zemin-inaat\/100069393232695\/","https:\/\/www.linkedin.com\/company\/fen-zemin-inaat\/?viewAsMember=true","https:\/\/www.instagram.com\/fenzemin\/"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false},"uagb_author_info":{"display_name":"info@fenzemin.com","author_link":"https:\/\/fenzemin.com\/en\/author\/fenzemin-com\/"},"uagb_comment_info":0,"uagb_excerpt":"Soil Nailing &amp; Soil Nail Walls | Fen Zemin &amp; \u0130n\u015faat Soil Nailing &amp; Soil Nail Walls | Fen Zemin &amp; \u0130n\u015faat Fen Zemin &amp; \u0130n\u015faat carries out soil nailing for excavation support and slope stabilisation projects, with nail geometry, drilling method, facing system and construction sequence determined according to ground conditions and geotechnical design.&hellip;","_links":{"self":[{"href":"https:\/\/fenzemin.com\/en\/wp-json\/wp\/v2\/pages\/2499","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/fenzemin.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/fenzemin.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/fenzemin.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/fenzemin.com\/en\/wp-json\/wp\/v2\/comments?post=2499"}],"version-history":[{"count":3,"href":"https:\/\/fenzemin.com\/en\/wp-json\/wp\/v2\/pages\/2499\/revisions"}],"predecessor-version":[{"id":2684,"href":"https:\/\/fenzemin.com\/en\/wp-json\/wp\/v2\/pages\/2499\/revisions\/2684"}],"up":[{"embeddable":true,"href":"https:\/\/fenzemin.com\/en\/wp-json\/wp\/v2\/pages\/2479"}],"wp:attachment":[{"href":"https:\/\/fenzemin.com\/en\/wp-json\/wp\/v2\/media?parent=2499"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}